According to the drawings of the station AC power supply system, conduct on-site point-by-point verification of the grounding points of the station AC power supply system.

△ Verify Whether There is a Common Neutral Line in the Dual Power Supply Circuit

△ Common Neutral Line Without Grounding
If the measured residual current of the circuit does not exceed 150mA, it can be considered that there is no repeated grounding of the neutral line, and the residual current during operation will not have an adverse impact on the residual current protection and monitoring.
If the measured residual current of the circuit reaches 150mA or more, cut off the power supply of the outgoing line circuit pole by pole, and further check whether the neutral line of the circuit cable and electrical equipment is repeatedly grounded through the neutral line to ground insulation test.
After outgoing from the Section I and Section II busbars of the central power distribution panel, a three-pole switching device is adopted in the load-side distribution box, and the neutral lines of the two power supplies share one neutral line busbar on the load side. The three-phase unbalanced current will shunt, resulting in the measured current value failing to truly reflect the actual residual current of the outgoing line, and the measured current is larger than the actual residual current. One power supply should be shut down and its neutral line should be disconnected before measurement. If the measured value is <150mA, it can be considered that there is no repeated grounding.
Through the investigation, it was found that there are 14 groups of dual power supply circuits in the station AC power supply system of the substation, among which 12 groups have common neutral lines without grounding; the power supplies of No. 1 DC charging panel and No. 2 DC charging panel have no common neutral lines and no grounding, and the corresponding circuit breakers and switching device air switches are all three-pole.
This investigation clarified the operation status of the station AC system of the substation, laying a solid foundation for the next work such as the installation of residual current monitoring (protection) devices.