1. Equipment Overview
Deployed HTA-3300 3P Smart High-Current Source (12A RMS, 36A peak) and HTV-6000 3P Smart High-Voltage Source (180V RMS) paired with the YD-300E Wireless Remote Master for synchronized power injectional testing.
2. Pre-Test Safety Protocols
- Confirmed no parallel testing on adjacent circuits.
- Ensured CT secondary circuits were never open and PT secondary circuits never shorted.
- Validated single-point grounding at injection interfaces to eliminate stray currents.
3. Test Wiring & Configuration
220kV Side Voltage Injection

Disconnected grounding switch 280070, connected HTV-6000 outputs to Busbar I-B PT terminals (A/B/C phases).
- Isolated switch 28007 and bridged its auxiliary contact to enable voltage sampling.
220kV Current Injection
标题
Cleared grounding at 488530; injected 120A via HTA-3300 into Line 4885’s CT path, with N-terminal bonded to ground.
- Ensured switches 4885/2600/2801 were closed, isolating unrelated branches.
110kV Side Setup (Images 5-7)

- Injected 240A at 110kV Line 798 via HTA-3300, phase-reversed to 220kV for differential balance.
- Disabled grounding switches 79830/50130, retaining only critical grounding points.
4. Parameter Configuration
Using the YD-300E Wireless Controller:
- Linked all devices via RF, configuring 0° phase angles for balance testing and 180° reversal for superposition.
- Balanced Mode: Achieved 0A differential current (<0.05A residual) across 220kV/110kV CTs (2500:1 ratio).
- Superposition Mode: Measured 0.096A differential (±0.05% accuracy), validating vector alignment.
5. Results & Compliance
- Confirmed IEC 61869-2/3 compliance in CT/PT ratio and phase displacement.
- Zero differential drift under 40kV simulated knee-point conditions.
- Automated reports generated via HTV-6000’s logging system for audit trails.